Editor’s note: This is a schedule of work being planned for Aug. 2-8. Weather conditions and unforeseen problems can cause delays or cancellation of work.

Bowie County

Texas 8 – At Sulphur River, replacing bridges.

Texas 93– Between Meadow Lane and Kennedy Lane, installing sidewalks.

Camp County

FM 1521 – From FM 1520 to Texas 11, seal coating highway.

Cass County

Texas 8 – At Sulphur River, replacing bridges.

Harrison County

U.S. 59 – From FM 1997 to Marion County line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

Texas 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.

Loop 390 – From U.S. 59 to Texas 43 North, repairing and resurfacing highway. Road closed to through-traffic, detour route is signed.

FM 1186 – From U.S. 59 to Panola County line, installing safety end treatments on culverts.

Marion County

U.S. 59 – From 1.5 miles south of FM 2208 to Harrison County line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

Morris County

Texas 49 – From Titus County line to FM 144, repairing and resurfacing highway.

Panola County

Texas 149 – At Texas 315, constructing overpass and widening highway.

U.S. 79 – From Texas 149 to Rusk County line, repairing and resurfacing highway.

Titus County

Texas 49 – From FM 1735 to Morris County line, repairing and resurfacing highway.

U.S. 271—At FM 127 overpass, repairing concrete pavement at bridge approaches.

FM 21 – From Franklin County Line to Camp County Line, seal coating highway.

FM 1402 – From FM 71 to I-30, seal coating highway.

FM 1734 – From US 67 to U.S. 271, seal coating highway.

Upshur County

U.S. 271 – From Camp County line to 0.5 mile north of FM 2088, resurfacing highway.

FM 593 – From FM 2796 to U.S. 271, seal coating highway.

Tags